· An smart parking area with capacity of 3,000 parking lot for car and motorbike
· Access and toilet facilities for the disable
· Dual power line will support 100% backup power
· Mitsubishi lift system
· 30 seconds for waiting lift
· Executive toilet facilities
· Equipped with “E Glass” ( fibreglass) for an ideal environment and saving energy
· Equipped withTrane centralised chiller controlled by BMS System